Project 2: Dredging of Pond
|
|
CUSTOMER:
|
City of Boston
|
|
PROJECT:
|
Chandler Pond, Brighton, MA
|
|
CONTRACT VALUE:
|
$525,000
|
|
DESCRIPTION:
|
Global was contracted to dredge a 10-acre pond located in Environmentally sensitive area of Brighton. Global utilized a series of dewatering pumps ranging from 60 GPM to 1,300 GPM. Per approved plans Global was responsible for the following:
- Installation of diversion swales around perimeter of pond
- Excavate 33,000 cubic yards of sediment
- Construction of temporary access roads
- Construction of concrete gate at outfall
- Site restoration to pre-construction conditions


|
|